• NMB Project Background


    The North Malay Basin (NMB) is located offshore Peninsular Malaysia immediately south of the Malaysia-Thailand Joint Development Areas (MTJDA) (Figure 1), approximately 150 km North East from Kota Bharu, in 55 to 60 m water depth. The NMB area consists of Blocks PM302, PM325 and PM326B. Hess Exploration & Production Malaysia B.V. (Hess) and PETRONAS Carigali Sdn Bhd (PCSB) are contractors to PETRONAS for the Production Sharing Contracts (PSCs) and have executed a Joint Operating Agreement (JOA) between them. Pursuant to the JOA, Hess and PCSB each hold 50% participating interest for the Blocks and Hess has been appointed as the Operator. The proposed development project is located within Block PM302.
    The Full Field Development (FFD) phase 1 includes:

    • •  A Central Processing Platform (CPP) with integrated Living Quarter (LQ) and bridge-linked WHP-A at Bergading;

    • • Three remote WHPs (BungaKesumba, Bergading C and Bergading D) which are connected via flowlines to the BergadingCPP;

    • •  An FSO to store the stabilized condensate moored approximately 2 km from the CPP; .

    • •  A new gas export pipeline approximately 19 km in length will be installed to connect the CPP to the new export scheme comprising a gathering pipeline connected to onshore processing facilities at Terengganu Gas Terminal (TGAST) in Kerteh, Terengganu.